Projects

Proven Performance Around The Globe

For more than 30 years, T.K.O Engineering has delivered reliable conveyor sampling solutions to mining operations worldwide. Our Go-Belt® Samplers are trusted for accurate, representative and dependable sampling performance.

30+

Years Experience

10+

Years of Recent Installations

Multiple

Mining Operations Served

Built To Last

Reliable and Proven Design

Featured Installations

Harmony Gold - Doornkop

Location: South Africa | 2024 | Gold

Go-Belt® Sampler installation providing automatic and representative conveyor sampling.

Sibanye-Stillwater (Mill Plant 1 and 2)

Location: Carltonville, South Africa | 2023 | Gold

2 x Go-Belt® Sampler

Harmony - Target

Location: Free State, South Africa | 2024 | Gold

Harmony - Mponeng

Location: Carltonville, South Africa | 2022 | Gold

Go-Belt® Sampler installed

Installation Register

 
Client Operation Country Commodity Year
Sibanye-Stillwater Beatrix R4 South Africa Gold 2026
Sibanye-Stillwater EZ Uranium Met Plant - Cook4 Plant South Africa Gold 2025
Barrick Gold Tanzania Tanzania Gold 2024
Harmony Avgold - Target Plant South Africa Gold

2024

Harmony Randfontein Estates - Doornkop South Africa Gold 2024
Sibanye-Stillwater Driefontien Operations  - Mill Plant 1 & 2 South Africa Gold 2023

Installation Gallery

Manufacturing

Go-Belt® Sampler being assembled in workshop.

Delivery

Sampler arriving on site.

Installation

Sampler being lifted and installed onto conveyor.

Sample Discharge

Discharge chute transferring sample into collection bin.

Operating Equipment

Completed sampler running on conveyor.

Let's Talk About Your Project

Our team is ready to provide the right sampling solution for your operation.

T.K.O Engineering CC

Phone: +27 82 350 4619 | Email: trevor@tkoengineering.com

© 2024 T.K.O Engineering CC. All rights reserved.

GO-BELT® is a registered trademark of T.K.O Engineering CC. All rights reserved.