How A Turnkey GO-BELT® Sample Plant Operates

Stage 1

Primary Sampling

The GO-BELT® Cross Belt Sampler extracts a representative sample from the conveyor stream.

Stage 2

Sample Transfer

Sample material is transferred through engineered chute systems.

Stage 3

Primary Crushing

Oversized material is reduced using sample crushers.

Stage 4

Sample Splitting

Rotary sample splitters divide the sample while maintaining representivity.

Stage 5

Secondary Preparation

Additional crushing, splitting or vibratory feeding processes are performed where required.

Stage 6

Sample Collection

Prepared samples are automatically collected into designated sample bins.

Stage 7

Laboratory Analysis

Representative samples are prepared for laboratory testing and metallurgical accounting.

Plant Components

GO-BELT® Cross Belt Sampler

Sample Transfer Chutes

Primary Crushers

Secondary Crushers

Rotary Sample Splitters

Vibratory Feeders

Sample Collection Bins

Structural Steel

Access Platforms

Electrical Control Systems

Laboratory Collection Facilities

Installed GO-BELT® Sample Plants

GO-BELT® technology has been incorporated into complete sampling plants across Southern Africa for more than 30 years.

YearOperationLocation
1992Vaal Reefs West PlantSouth Africa
2001Modikwa Concentrator PlantSouth Africa
2008Central Deep Plant CV-02Rustenburg, South Africa

Vaal Reefs West Plant now forms part of Harmony Doornkop operations.
Central Deep Plant CV-02 now forms part of Sibanye-Stillwater operations.

Plant Installation Gallery

Why Choose T.K.O Engineering

30+ Years Of Sampling Experience

Decades of practical experience designing and delivering complete sampling plant solutions for the mining industry.

Complete Turnkey Delivery

End-to-end project delivery from design and engineering through to installation, commissioning and handover.

Custom Engineered Solutions

Every sampling plant is designed around specific operational requirements and site conditions.

Proven Mining Applications

Track record of successful installations across coal, platinum, gold, iron ore and base metal operations.

Site Installation Expertise

Experienced site teams ensure smooth installation, structural integration and system commissioning on location.

Long-Term Support

Ongoing maintenance, spare parts, technical support and operational assistance for all installed plants.

Discuss Your Sampling Requirements

Speak to our engineering team about complete turnkey GO-BELT® Sample Plant solutions.

T.K.O Engineering CC

Phone: +27 82 350 4619 | Email: trevor@tkoengineering.com

© 2024 T.K.O Engineering CC. All rights reserved.

GO-BELT® is a registered trademark of T.K.O Engineering CC. All rights reserved.